Gauge improvement

Three days ago I have received the gauges (duct press and vertical speed) from Opencockpits.

As the built in servo motors are quite loud on holding position, I have changed them to another type. Within 3 hours all 3 servos were replaced and ready to be built in. During the weekend I want to implement the gauges in the overhead panel. A video will follow once they are working.

Overhead in the final place

During the weekend we have mounted the overhead into his final place. We archieved another importmant milestone during the cockpit project.

OLYMPUS DIGITAL CAMERA

All systems are working well. Only the LCD display lost 2 connections, but this can be resolved during the next days.
In the following weeks we will continue to work on the overhead construction.

Here a nice shot from some wires on the back of the overhead.

OLYMPUS DIGITAL CAMERA

Structure building

Today we have started building the structure for the overhead-wall mouting.

This was our material 6x 3m long and 34mmx50mm dimension

This was the finished product:

Also the second side was finished. Between those 2 structures the Overhead will be mounted.

Building a 737-800 Homecockpit [OE-LNJ]